Invasive Species Point (56)
Delineated Wetlands (2)
| Desktop Determination |
| Field Delineated |
Delineated Waterways (3)
| Desktop Determination |
| Field Delineated |
Delineated Waterways (4)
| Desk Determination |
| Field Delineated |
Parcels - Received Mailer (5)
Airports (6)
Airports Line (7)
AM/FM Cell Towers (8)
| AM/FM Commercial Cellular |
| Private |
CAFO (10)
Residences (11)
Industrial Commercial (12)
Sensitive Sites (labeled at zoom) (13)
Building - Other or Agricultural (14)
Zoning Generalized - All Villages (15)
| Agricultural |
| Commercial |
| Conservancy |
| Industrial/Manufacturing |
| Institutional/Public Use |
| No Zoning/Unknown |
| Open Space/Recreational |
| Planned Unit Development |
| Planned Unit Development (PUD) |
| Residential |
Public Lands (16)
Conservation Easement (17)
Landcover (Update 09/17/2025) (41)
| Agriculture - Row Crop |
| Developed/Urban |
| Forested |
| Forested Wetland |
| Grasslands |
| Non-Forested Wetland |
| Open Water |
Landcover (19)
| Agriculture |
| Developed/Urban |
| Forested |
| Forested Wetland |
| Grasslands |
| Non-Forested Wetland |
| Open Water |
Electric Distribution Line (21)
Electric Transmission Line (22)
Structures - Common (53)
Structures - Proposed (51)
Proposed - Alternate (45)
Temporary Clear Span Bridge (TCSB) (49)
Invasive Species Point (44)
Access Roads Off ROW (47)
Existing Substation Site Fence (43)
Construction Workspace (42)
Access Roads - Off ROW (34)
Segment Nodes (24)
Under Consideration (26)
Removed from Consideration (27)
Common Routes (39)
Proposed Routes (37)
Alternative Routes (28)
Access Roads (29)
Wetland Matting (25)
Wetland Matting - Off ROW (31)
Wetland Matting (30)
Right of Way (ROW) (33)
Laydown Areas (35)
Easement (36)
Project Boundary (32)
|