Parcel (2)
Parcel 300 ft (3)
Airport (4)
Communication Tower (5)
School (6)
Residence (7)
Confined Animal Operation (8)
Ag Building (9)
Culvert or Bridge (10)
Field Delineated Wetland (12)
Desktop Wetland (13)
Field Delineated Waterway (14)
Desktop Waterway (15)
Land Cover ROW (16)
| Agricultural - Crop Land |
| Developed/Urban |
| Forested Wetland |
| Grassland |
| Non-Forested Wetland |
| Open Water |
| Upland Forest |
Land Cover (17)
| Agricultural - Crop Land |
| Developed/Urban |
| Forested Wetland |
| Grassland |
| Non-Forested Wetland |
| Open Water |
| Upland Forest |
Substation (19)
Electric Distribution Line (20)
Electrc Distribution Line (21)
Electric Transmission Line (22)
TCSB (24)
Laydown Yard (25)
In-ROW Access and Work Pads (26)
Temporary Work Space (27)
Additional Temporary Work Space (28)
Segment Node (29)
Transmission Line Structure (30)
| Concrete Caisson |
| Direct Embed |
| Retired - Cap and Remain |
| Retired - Remove Structure |
| Temporary Stub Pole |
| Within Existing Substation - No Impacts |
| Within Proposed Substation |
Transmission Line Route (31)
Kieler Substation (32)
McDonald Substation (33)
Centerline Sharing (34)
| New |
| Shared |
Corridor Sharing (35)
| New |
| Shared |
Proposed Route ROW (36)
Access Route (37)
Off-ROW Access Route (38)
Grading Area (39)
Project Boundary (40)
|