Parcels (62)
Residences (61)
| Participating |
| Non-Participating |
Generation-Tie Line ROW (36)
Generation-Tie Line (37)
Fence (32)
Site Area (33)
Well Site (34)
Temporary Construction Fence (35)
Laydown, Parking or Storage Area (38)
Stormwater Pond (39)
Access Road (40)
Generation-Tie Line ROW (46)
Generation-Tie Line (47)
| ATC RCEC Bradford to West Darien 138 kV (Rebuild) |
| Invenergy |
Temporary Construction Fence (56)
Fence (42)
Site Area (43)
Well Site (44)
Temporary Construction Fence (45)
Generation-Tie Line Staging Area (49)
Laydown, Parking or Storage Area (48)
Stormwater Pond (50)
Access Road (51)
| Gravel |
| Paved |
Switchyard (52)
Substation North Creek (53)
Substation Darien Solar (54)
Project Area Boundary (55)
Arrays (30)
L_E-AC-CABLE-8B (29)
L_E-AC-CABLE-8A (28)
L_E-AC-CABLE-7B (27)
L_E-AC-CABLE-7A (26)
L_E-AC-CABLE-06 (25)
L_E-AC-CABLE-03 (24)
L_E-AC-CABLE-2B (23)
L_E-AC-CABLE-2A (22)
L_E-AC-CABLE-1B (21)
L_E-AC-CABLE-1A (20)
Fences (0)
Access Roads (19)
Inverters (2)
Access Roads (3)
Laydown Areas (4)
Collector Substation (5)
BESS (6)
Switchyard (7)
Proposed Array Fences (8)
Proposed Collector Circuits (9)
Proposed Arrays (10)
Proposed Power Blocks (11)
Proposed O&M Building (12)
Alternative Collector Circuits (13)
Alternative Arrays (14)
Alternative Power Blocks (15)
Alternative O&M Building (16)
Alternative Laydown Areas (17)
|