Parcels (1)
WBIC Flowline Crossings (2)
Microwave Service Towers (4)
MET Towers (5)
FM Transmission Towers (6)
Communication Infrastructure (7)
Cellular Towers (8)
Broadband Radio Towers (9)
Antenna Structure Towers (10)
AM Transmission Tower (11)
ADLS Tower (12)
Airports (13)
Runways (14)
Runway Lines (15)
Residences (16)
| Non-Participating |
| Participating |
Sensitive Sites (17)
| |
| Assisted Living Facility |
| Cemetery |
| Daycare Center |
| Hospital/Clinic |
| Place of Worship |
| School |
| <all other values> |
Schools - 3 mile buffer (80)
Industrial Commercial Facilities (18)
Other Buildings (19)
| Agricultural Building |
| Garage/Shed; School Accessory Building; Vacant Commercial |
CAFOs (20)
Culverts (21)
Zoning (22)
| A-1 |
| A-2 |
| AB-1 |
| AC-1 |
| AR-1 |
| B-2 |
| B-3 |
| B-4 |
| C-1 |
| C2 |
| CFR |
| Commercial |
| Conservation |
| FP |
| Industrial |
| Institutional/Public |
| M1 |
| M2 |
| R-1 |
| R-2 |
| R-3 |
| Rural Development |
| <all other values> |
Trout Streams (23)
| CLASS I |
| CLASS II |
WBIC Flowlines (24)
10ft Contours (25)
Soil Unit Boundaries (26)
| All areas are prime farmland |
| Farmland of statewide importance |
| Prime farmland if drained |
| Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season |
Public Lands (27)
Land Cover (28)
| Traditional/Row Crops |
| Prairie/Grasslands/Pasture/Fallow field |
| Upland Woods |
| Wetland |
| Residential |
| Developed |
| Industrial/Commercial |
Land Cover Fenced Area (29)
| Traditional/Row Crops |
Desktop Wetlands Comprehensive (31)
Field Delineated Wetlands (32)
Wetlands Post Field Work (33)
Desktop Waterways Comprehensive (34)
Field Delineated Waterways (35)
Badger Hollow Wind Desktop Waterways Post Field Work (36)
Field Delineation Area (37)
FEMA Floodplain (38)
Depth to Bedrock (39)
| Bedrock is between 50 feet and 5 feet of the land surface |
| Greater than 70% of the area has bedrock within 5 feet of the land surface |
Electric Transmission Line (41)
Electric Distribution Lines (42)
Wetland and Waterway Crossing Locations (97)
WBIC Flowline Crossing Location (96)
Bore Pit (87)
Turbine (94)
Access Road (90)
Crane Path (99)
Collector Circuit (91)
Turbine (86)
Access Road (82)
Crane Path (85)
Collector Circuit (83)
Temporary Staging Area (95)
Temporary Construction ROW (88)
Bore Pits (44)
Laydown Yard (46)
Temporary Access Road (47)
Temporary Matting (48)
Turning Structures (50)
Interconnection Point (51)
Generator Tie Line (52)
Interconnection Switchyard (53)
Temporary Staging Area (54)
Generator Tie Line ROW (55)
Interconnection Point (57)
Collector Substation Footprint (58)
Stormwater Facilities (59)
Access Road (60)
Parcel (61)
Turbine (63)
Access Roads (64)
Collector Circuit (65)
Crane Paths Centerline (66)
Turbine (68)
Access Roads (69)
Crane Paths Centerline (71)
Collector Circuit (70)
Storage Yard (73)
Stormwater Facilities (74)
O&M Building (75)
Parking Lot (76)
Access Road (77)
Parcel (78)
Project Area (79)
|